*The builder shall have the right to substitute other products and materials for those listed in the specifications provided that the substituted products and materials are of the quality equal to or better than the products and materials so listed and provided. Floors and specific finishes will depend on the builder’s package as selected. All specifications, dimensions and materials are subject to change without notice. Rendering is artist’s impression. E.&.O.E.